Blog
UC Davis Health Folsom Medical Care Clinic
Folsom, CA
Client: Rudolph & Sletten / RankerAMG
Size: 114,000 SF
Scopes of Work: air barrier, insulation, joint sealants
Project Details:
MTN Inc. is proud to be part of the construction of this state-of-the-art, three-story medical facility owned and operated by UC Davis. This project supports the consolidation of three existing Folsom facilities into one advanced facility boasting uninhibited views along the western facade of the Sierra foothills. MTN Inc. was selected to install the Perm-A-Barrier VPS 30 air barrier system by GCP, the R-tech 25 psi foil-faced rigid insulation, Dow 758 joint sealants, and the perimeter sealants around the curtain wall systems using the DowSil 795.
Project Photos:











