MTN Inc. is proud to be part of the construction of this state-of-the-art, three-story medical facility owned and operated by UC Davis. This project supports the consolidation of three existing Folsom facilities into one advanced facility boasting uninhibited views along the western facade of the Sierra foothills. MTN Inc. was selected to install the Perm-A-Barrier VPS 30 air barrier system by GCP, the R-tech 25 psi foil-faced rigid insulation, Dow 758 joint sealants, and the perimeter sealants around the curtain wall systems using the DowSil 795.
Be the first to know what we're up to.
©2024 MTN INC. All Rights Reserved.
Be the first to know about new events and happenings.