Project Description
Cardinal Health
Five miles outside of downtown Detroit is the new award winning brownfield project, Cardinal Health Medical Distribution Center. The 275,000-square-foot $30 million project was built to LEED Silver specifications. After bulldozers entered the site in 2014, it became the largest passive vapor ventilation system project east of the Mississippi. MTN, Inc installed the system.
Off-Site Links
Cardinal Health Medical Distribution Center: “Catalyst Converter” in the Motor City
Robbie Tarpley Raffish | Kirco

Cardinal Health Distribution Center Opens in Detroit
News | Henry Ford Health System